AM Ground Systems Company

Home Projects Quote Request Services & Contact About Links
Toll Free:  1-877-766-2999  Local: 931-766-2999
AGSC NEWS
UPDATING NEWS

Please standby...

Law Enforcement Officials overjoyed that Heroin use is increasing...

Story

Copper Theft Still Rising Even as Scrap Prices Go Down
 
 
WBCO Bucyrus, OH
August 2008

Install new sample line via Directional Boring

WABC.  New York, NY
July 2008

Ground System Evaluation and Repair

KRVN Holdredge, NE
July 2007

Ground System Evaluation

WBWL  Jacksonville, FL
June 2008

Rebuild 5 tower Inline DA

KWAM West Memphis, AR
Feburary 2008 and beyond

Refurbish array infrastructure, site access, array tuneup

XEGH Rio Bravo, Mexico
November 2007

Build new ground system

KTIS Minneapolis, MN
October 2007

Evaluate and repair ground system

WILC  Laurel, MD
July 2007

Repair and enhance tower base grounding

KDWA Hastings, MN
July 2007

Build new ground system

WIBC  Indianapolis IN
July 2007

Repair and enhance tower base grounding

WNOG Naples FL
June 2007

Ground System Evaluation

WYHL  Meridian MS
June 2007

Rebuild ND Ground System

KZDC  San Antonio TX
March 2007

Build New 4 tower ground system

WCIN  Cincinnati OH
June 2007

Repair vandalism damage.

WMBG  Williamsburg VA
March 2007

Build New ND ground system

KCRG Cedar Rapids, IA

 

October 2006

Rebuild 3 tower ground system and install new feed and sample lines.

KRLD Dallas TX

December 2006

Rebuild 2 tower array ground system and building ground infrastructure.

WPHE Phoenixville, PA

September 2006

2 tower DA rebuild

KDWA Hastings, MN

July 2006 ND Build

WCIN Cincinnati, OH

Feb.  2006  5 twr DA Build

WNDA Deland, FL

Dec. 2005  ND Rebuild

KMOX St. Louis, Mo

Nov. 2005  ND Rebuild & other work.

 
     
     
     
 

This Page has had

 
 

Hit Counter

 
 

Visitors Since The Site was Rebuilt September '05

 
     

WVOP Vidalia, GA

This project was subcontracted thru J-Crow Towers out of Mississippi.  The existing AM tower was being replaced to allow an FM colocation. 


 

WVOP Sweet Onion Country

This project was BBB (Before Big Bird). My 2001 Dodge Ram was the work horse then.

Looking across the ground field. The new tower will be built about 50ft toward the camera position.

Shelton brazing radials.

Shelton still brazing... In the very top portion of this image you can see a trench and a couple of guys working.

The stations FM, STL, tower light and AM coax ran from the back of the TX building down to the tower a hundred feet or so away. The only problem was that they were all ran at different times and whoever ran them chose different paths for each. About 1/4 of the ground system was consumed by the spiderweb of cables. We had the shallowly buried cables dug up and all place in a single deep trench. No more problem.

The station rented a trencher to rebury the coaxes and other wiring.

We had to work on the rented trencher almost as much as the temp help operated it.

AM Ground Systems Co.