AGSC NEWS
UPDATING NEWS

Please standby...

Law Enforcement Officials overjoyed that Heroin use is increasing...

Story

Copper Theft Still Rising Even as Scrap Prices Go Down
 
 
WBCO Bucyrus, OH
August 2008

Install new sample line via Directional Boring

WABC.  New York, NY
July 2008

Ground System Evaluation and Repair

KRVN Holdredge, NE
July 2007

Ground System Evaluation

WBWL  Jacksonville, FL
June 2008

Rebuild 5 tower Inline DA

KWAM West Memphis, AR
Feburary 2008 and beyond

Refurbish array infrastructure, site access, array tuneup

XEGH Rio Bravo, Mexico
November 2007

Build new ground system

KTIS Minneapolis, MN
October 2007

Evaluate and repair ground system

WILC  Laurel, MD
July 2007

Repair and enhance tower base grounding

KDWA Hastings, MN
July 2007

Build new ground system

WIBC  Indianapolis IN
July 2007

Repair and enhance tower base grounding

WNOG Naples FL
June 2007

Ground System Evaluation

WYHL  Meridian MS
June 2007

Rebuild ND Ground System

KZDC  San Antonio TX
March 2007

Build New 4 tower ground system

WCIN  Cincinnati OH
June 2007

Repair vandalism damage.

WMBG  Williamsburg VA
March 2007

Build New ND ground system

KCRG Cedar Rapids, IA

 

October 2006

Rebuild 3 tower ground system and install new feed and sample lines.

KRLD Dallas TX

December 2006

Rebuild 2 tower array ground system and building ground infrastructure.

WPHE Phoenixville, PA

September 2006

2 tower DA rebuild

KDWA Hastings, MN

July 2006 ND Build

WCIN Cincinnati, OH

Feb.  2006  5 twr DA Build

WNDA Deland, FL

Dec. 2005  ND Rebuild

KMOX St. Louis, Mo

Nov. 2005  ND Rebuild & other work.

 
     
     
     
 

This Page has had

 
 

Hit Counter

 
 

Visitors Since The Site was Rebuilt September '05

 
     

WCFJ Transmitter Site
Chicago, IL
November, 1999

We performed the plowing at this site for station engineer Mike McCarthy.  Mike's crew completed the brazing and actual site construction.  This site is an 8 tower directional rebuilt by MRE (Mike's business).  Previous owners had allowed the site to deteriorate to the point that Mike had to literally demolish all of the old towers and buildings and start over.  New Pirod towers were installed and connected to Kintronics built phasing equipment.  AGS built the ground system using over 100,000 feet of wire.
 
 


 
 
  If this picture makes you think that the day was miserable and cold...  It is accurate.
 

This image is looking basically west from a tower on the eastern edge of the property.  The section of radials that we were plowing here ended at the trench visible just in front of the tractor.  Radials from a tower to the right of the picture intersect at the trench.
 

 The extra reels of wire tied across the back of the plow had to be added due the the extreme hardness of the ground.  The site had been graded and cut down into gray clay that was just short of limestone.  We had to locate a special vibrating plow to break through the soil on one tower.
 
 


 

A large amount of site work had not been completed when we arrived (as scheduled) to start plowing.  We suffered numerous delays and wasted a lot of time working around tower crews, excavators and open ditches.  Here is an open wiring vault that I had just finished back filling around.
 
 

Back filling trenches left by other contractors.
 

Moving concrete vault extensions left by other contractors.
 

Moving a pile of dirt left by...

Finally back to plowing.

Me getting ready to start another days work... putting the headset and radio on.
 


 
 
 
 
 






AM Ground Systems Co.